Home Services Dubai Municipality Approval

Dubai Municipality Approval

Are you looking for any agency that can help you to gain Dubai Municipality Approval? Just get in touch with us to get easy DM Approval.

Dubai Municipality Approval | DM Approval | DM Dubai

Dubai Approvals Team is a licensed engineering company in Dubai that provides you with the best engineering solutions to gain easy Dubai Municipality Approval for offices, restaurants, cafeterias, etc. Our team of experts will ensure you'll have the Dubai municipality Approval, also known as DM Approval, for your offices, restaurants, or warehouse as soon as possible without any kind of fuss. You can also consult our experts if you are having any problem with getting other related Dubai Approvals. Our services are available all the time of year throughout the state of Dubai.

Send Enquiry

How Can We Reach You?
DM Approval | DM Dubai | Dubai Municipality Approval

What is Dubai Municipality Approval?

Dubai Municipality or DM provides approval services for building permits and other licenses for new buildings and redevelopments of existing buildings. Any private and government entities, individuals, and businesses with a proposed building plans can benefit from this service and get DM approval for their projects. The approval service can be acquired for proposed drawings and plans of developmental projects in the jurisdiction of DM. Some of the various types of projects that are covered under this service include single and multi-story buildings, industrial structures, villas, and floor ratio areas. The Dubai Municipality approval assures that every project work complies with the standards and guidelines of the authority, if not, no physical work should be initiated.

Why Choose Dubai Municipality?

Office Approval

As per the law of Dubai, Dubai Municipality or DM Dubai corroborates the process of approving the offices to be established in the Dubai region. There are various requirements and documents that need to be submitted before you can get any Dubai municipality approval. The first thing that may be put into inspection by the Dubai Municipality is the building in which the office is to be set and the purpose of the office. Dubai Municipality will cross-check the legality of the building and the purpose of the office before going to other documents.

Restaurant Approval

Getting Dubai Municipality Approval for a commercial such as a restaurant approval can be quite a daunting task. We are a licensed engineering company that provides you with the layout to get approvals from the DM Authority such as Food Control Department Dubai for DM approval. Without the final approval from the Food Control Department, the restaurant cannot be started for business.

Some of the basic prerequisites to get restaurant approval are as follows:

The floors and the ceiling should be easily cleanable. It should have a proper draining system and the materials to build the restaurant should be fireproof, light-colored, smooth, and non-toxic.

The restaurant should have proper lighting and ventilation system.

The restaurant should also gain a pest control contract from an approved pest control company.

The drainage connection, as well as water connections, should not be visible outside.

The chimney duct in the restaurant must be at least 2m higher than the nearest building.

All the tables used should be stainless.

Cleaning chemicals should be stored in a separate room.

Along with these office and restaurant approval, we also provide you with the best engineering options for your warehouse mezzanine.

DM Approval Building and Construction Services

Approval to Demolish or Delist a Building in the Historic Areas
Existing Building Evaluation according to Dubai Universal Design Code (Wosool)
Sand Transfer Permit
Self-Decor Permit
Completion and Services Connection
Structural Inspection
Boundary Wall or Fence Permit
Approval for Building Completion Certificate with Dispute
Building Modifications or Additions Permit
Design and Permit Service Blocks in Private Villas
No Objection Certificate for Infrastructure Projects
Approval of Public and Private Swimming Pool Drawings
Structural License for Roof and/or Pole Advertisement
No Objection Certificate or NOC for Well Drilling
Night Works Permit in Under Construction Projects
Resolution of Technical Disputes
Sand Supply Permit
Approved Engineering Drawings Copy
Temporary Electricity Supply for Construction Sites
No Objection Letter to Add New Meter or to Increase Electricity Current
Gate Level of a Building Entrance
Painting and Maintenance permit
Extend the Validity of Approved Drawings
Renewing a Construction License
New Building Permit
Preliminary approval for New building, Additions, or Adjustment
Site Preparation and Excavation Permit
Test Samples of Construction Materials
Historical Areas Building Maintenance Permit 
Apply for approval to Design a Building in Historical Areas
 

Please check for other types of Dubai approvals for further assistance.

To know the procedure of the DM approval provided by the Dubai Municipality Portal or DM Dubai, please visit Procedure for Getting DM Approvals. We can also help you know all the approvals provided by the Dubai Municipality here. You can Contact Us for any of your queries.

OUR BLOG

Why people love us

Chat on Whatsapp chat on whatsapp