Dubai approvals team is company based in Dubai with a vast range of experience and team of expert engineers. Drawing approval is one of our services range. We were established with one goal to provide our customers with every kind of approval services to our customers for constructing buildings, industries, offices that can help them get easy approval in Dubai. We have evolved as the biggest engineering solution provider for our customers in Dubai. Our team with vast experience is equipped with the latest engineering technology and provides with the swiftest and quickest service in Dubai. Drawing approval for your office, restaurant, cafeteria, swimming pool etc. was never easy before.
The process of getting approval for different kinds of commercial and residential building can be a quite annoying process but we provide one stop location for every kind of solution. We provide the following services to our customers:
Drawing building approval in Dubai
Drawing approvals in Dubai for buildings can be a hectic process. Some of the steps for drawing approval are as follows:
The site inspection is obtained from health department. Before buying the land the buyer should always verify whether the land is approved by authorities to build buildings. inspection will also provide the buyer with many information such as the type of the soil, size of the land etc.
Septic permit includes the detailed drawing of the building. Size of the building, driveway, septic system placement of well etc. are the things to be included in the drawing. This is also obtained from the health department. During the septic process one needs to apply for the well permit as well. The septic and well permits can also be obtained from health department.
The building should be designed in such a way that it fulfills the requirement of the township in which the building is built. Minimum road frontage, area of the building, set backs, etc. must be designed with accordance to the township requirement. Township zoning permit can be gained from township zoning inspector after fulfilling the requirement. This permit is gained only after the issuing of septic permit.
After gaining the septic permit from department of health and township zoning permit one must apply for the building permit. The building permit can be obtained from building authority. Building authority officers will inspect different aspects of the building such as foundation type, size and spacing of support post and pads, beam size, floor plan layout, HVAC system, electric service size etc. After getting fully satisfied the building authority will issue the building permit.
We have helped our thousands of customers to gain approval from different authorities for their buildings, offices etc. Hence you can contact us for easy approval services because we help you gain approval from different authorities such as Dubai municipality, Dubai Civic defence, Dubai Silicon Oasis DSO, Damac, Nakheel, Emaar, JAFZA, Tecom DCCA and many more.
Please visit Services Menu for other types of approval.